“I used to think getting paid in 90 days was normal. Now I get paid in 17 days.Bryan Daughtry, Owner Dry Patrol of Central Ohio
“I used to think getting paid in 90 days was normal. Now I get paid in 17 days.
If a contractor gets a stop work order on a remodel job(for FEMA flood control reasons, nothing structural) can further work be done (roofing) to ensure the rest of the existing structure does not get water damage from rain?