A map for the project located in Dallas, Texas.
Commercial Construction Project at

1935 Medical District Dr

Dallas, TX 75235

  • Last known event: 01/11/2024
  • First known event: 10/15/2016
LevelsetProjectsTexasDallas1935 Medical District Dr

Property Details


PROJECT TYPE

Commercial

CITY

Dallas

Key Facts

The project located at 1935 Medical District Dr, Dallas, Texas 75235 has had 88 companies do work over the last 9 years.

Lien History

There has been 13 liens at this address with a reported total value of $1,347,325.84.

Project History


On this project at 1935 Medical District Dr, Dallas, TX 75235 there have been 22 permits filed, 18 preliminary notices exchanged, 0 lien waivers exchanged between companies and 13 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.

Overview

22

PERMITS FILED

18

PRELIMINARY NOTICES

0

LIEN WAIVERS

13

LIEN HISTORY

Payment Timeline

01/11/2024

Mechanics Lien Filed

Lien filed by TDIndustries, Inc.

Lien filed against Children S Health System of Texas, Children S Medical Center

$14,314


Source: Levelset Data

12/18/2023

Lien Threatened


Source: Levelset Data

11/13/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $5,000


Source: Levelset Data

11/13/2023

Mechanics Lien Filed

Lien filed by TDIndustries, Inc. | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$934,984


Source: Levelset Data

10/13/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

09/13/2023

Mechanics Lien Filed

Lien filed by TDIndustries, Inc. | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$144,495


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $5,000


Source: Levelset Data

06/30/2023

Mechanics Lien Filed

Lien filed by Naylor Commercial Interiors | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas

GC listed on lien: McCarthy Building Companies

Property Owner: Children's Medical Center Dallas

$3,560


Source: Levelset Data

06/29/2023

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies

Over $1,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against Robins & Morton

Over $5,000


Source: Levelset Data

06/15/2023

Lien Threatened

Lien threat sent to McCarthy Building Companies

Over $1,000


Source: Levelset Data

06/09/2023

Lien Threatened

Lien threat sent to McCarthy Building Companies

Over $5,000


Source: Levelset Data

05/03/2023

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $5,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

01/03/2023

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2301032006

$200,000


Source: ConstructionMonitor

01/03/2023

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2301032005

$200,000


Source: ConstructionMonitor

11/21/2022

Lien Threatened

Lien threat sent to Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies, TDIndustries, Inc.

Over $5,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Robins & Morton

Over $1,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies, TDIndustries, Inc.

Over $10,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against Robins & Morton

Over $1,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/17/2022

Mechanics Lien Filed


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Brasfield & Gorrie LLC, Children's Medical Center Dallas

Over $1,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/06/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2205062001

$5,000,000


Source: ConstructionMonitor

04/19/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: DPR Construction, Children's Medical Center Dallas

# 2204191120

$100,000


Source: ConstructionMonitor

04/19/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: DPR Construction, Children's Medical Center Dallas

# 2204191087

$160,000


Source: ConstructionMonitor

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Less than $1,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, Skiles Construction

Over $1,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $5,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Brasfield & Gorrie LLC, Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

02/15/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Robins & Morton

# 2202152006

$870,773


Source: ConstructionMonitor

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

02/15/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Robins & Morton

# 2202152004

$439,618


Source: ConstructionMonitor

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Brasfield & Gorrie LLC, Mecca Design & Production

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Brasfield & Gorrie LLC, Children's Medical Center Dallas, Mecca Design & Production

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Brasfield & Gorrie LLC, Mecca Design & Production

Over $5,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

01/13/2022

Mechanics Lien Filed


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, Skiles Construction

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, Skiles Construction

Over $1,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, Skiles Construction

Over $10,000


Source: Levelset Data

09/27/2021

Mechanics Lien Filed

Lien filed by Joe Hammes

Lien filed against Children's Medical Center Dallas, HB Concrete

Property Owner: Children's Medical Center Dallas

$2,473


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $1,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, Skiles Construction

Over $1,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, McCarthy Building Companies

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

08/12/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Robins & Morton

# 2108121005

$439,618


Source: ConstructionMonitor

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against High Tech Drywall, McCarthy Building Companies

Over $5,000


Source: Levelset Data

07/15/2021

Slow Payment Reported


Source: Levelset Data

06/29/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2106292004

$225,000


Source: ConstructionMonitor

06/15/2021

Slow Payment Reported

Slow Payment Reported Against High Tech Drywall, McCarthy Building Companies

Over $5,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

06/15/2021

Mechanics Lien Filed

Lien filed by TDIndustries, Inc. | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$22,655


Source: Levelset Data

06/15/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2106152002

$45,600


Source: ConstructionMonitor

04/27/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, AECOM Hunt (Hunt Construction Group, Inc.)

# 2104272009

$432,295


Source: ConstructionMonitor

04/27/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, AECOM Hunt (Hunt Construction Group, Inc.)

# 2104272008

$432,295


Source: ConstructionMonitor

04/26/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2104261047

$225,000


Source: ConstructionMonitor

04/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

04/15/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: McCarthy Building Companies, Children's Medical Center Dallas

# 2104151152

$495,537


Source: ConstructionMonitor

03/23/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Skiles Construction

# 2103231148

$2,400,000


Source: ConstructionMonitor

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

01/29/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Structure Tone Southwest

# 2101291076

$190,000


Permit Description

Remodel Commercial


Source: ConstructionMonitor

01/21/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, AECOM Hunt (Hunt Construction Group, Inc.)

# 2101211002

$432,295


Permit Description

Renovation Children's Health


Source: ConstructionMonitor

01/15/2021

Mechanics Lien Filed

Lien filed by TDIndustries, Inc. | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$82,518


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

01/08/2021

Lien Threatened

Lien threat sent to TDIndustries, Inc.

Over $5,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

12/07/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, McCarthy Building Companies

# 2012071068

$45,600


Source: ConstructionMonitor

11/13/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $1,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

11/11/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas, Skiles Group

# 2011111027

$1,850,000


Permit Description

Remodel Children's Medical Center


Source: ConstructionMonitor

11/10/2020

Mechanics Lien Filed

Lien filed by TDIndustries, Inc. | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$18,174


Source: Levelset Data

10/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

10/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

10/15/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas

# 2010151035

$45,000


Source: ConstructionMonitor

09/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, DPR Construction

Over $5,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

08/28/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: Brasfield & Gorrie LLC, Children's Medical Center Dallas

# 2008281094

$1,588,380


Source: ConstructionMonitor

08/14/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

08/14/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

07/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, DPR Construction

Over $1,000


Source: Levelset Data

06/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

05/26/2020

Mechanics Lien Filed

Lien filed by Alpha Insulation & Waterproofing Co | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Children's Medical Center Dallas

$16,629


Source: Levelset Data

05/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, SDB

Over $10,000


Source: Levelset Data

05/15/2020

Slow Payment Reported


Source: Levelset Data

04/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

04/15/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

04/14/2020

Mechanics Lien Filed

Lien filed by Commercial Fireproofing & Insulation | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, Robins & Morton

GC listed on lien: Robins & Morton

Property Owner: Children's Medical Center Dallas

$57,145


Source: Levelset Data

04/01/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: Children's Medical Center Dallas

# 2004011131

$24,587


Source: ConstructionMonitor

03/13/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

02/20/2020

Lien Threatened

Lien threat sent to Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

02/14/2020

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

01/15/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $1,000


Source: Levelset Data

11/15/2019

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

09/13/2019

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

09/13/2019

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas

Over $10,000


Source: Levelset Data

08/15/2019

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

07/15/2019

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, TDIndustries, Inc.

Over $10,000


Source: Levelset Data

07/15/2019

Mechanics Lien Filed

Lien filed by Pdv Associates | Claimant directly hired by GC

Lien filed against Children's Medical Center Dallas, DPR Construction

GC listed on lien: DPR Construction

Property Owner: Children's Medical Center Dallas

$1,010


Source: Levelset Data

07/15/2019

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

03/16/2019

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

01/16/2019

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

01/16/2019

Slow Payment Reported

Slow Payment Reported Against Children's Medical Center Dallas, J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

12/15/2018

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

10/15/2016

Slow Payment Reported

Slow Payment Reported Against Dynamic Systems Inc., Robins & Morton

Over $10,000


Source: Levelset Data

Full Project Job Tree88

Companies


In this section, you can find all 88 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.

Lender

Unknown Company

Property Owner

General Contractor (10)

Bonded by Arch Insurance Company
Bonded by Arch Insurance Company
Bonded by Arch Insurance Company
Bonded by Arch Insurance Company
Bonded by Arch Insurance Company
Bonded by Arch Insurance Company

Subcontractor (61)

Subcontractor
Subcontractor

Supplier (16)

Surety Companies (2)

AI
Arch Insurance Company
FI
Federal Insurance Company (a Chubb Company)

Job Hierarchy


Lender

Unknown Company

Property Owner

General Contractor (10)

View All
Bonded by Arch Insurance Company

Subcontractor (61)

View All

Supplier (16)

View All