Property Details


PROJECT TYPE

Commercial

PROPERTY OWNER

2500 San Gabriel LLC

CITY

Austin

Key Facts

The project located at 2500 San Gabriel St, Austin, Texas 78705 has had 30 companies do work over the last 8 years.

Lien History

There has been 15 liens at this address with a reported total value of $2,152,555.73.

Project History


On this project at 2500 San Gabriel St, Austin, TX 78705 there have been 1 permit filed, 7 preliminary notices exchanged, 0 lien waivers exchanged between companies and 15 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.

Overview

1

PERMITS FILED

7

PRELIMINARY NOTICES

0

LIEN WAIVERS

15

LIEN HISTORY

Payment Timeline

01/30/2024

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $10,000


Source: Levelset Data

10/24/2023

Mechanics Lien Filed

Lien filed by Greater Dallas Roofing | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$13,445


Source: Levelset Data

10/24/2023

Mechanics Lien Filed

Lien filed by Greater Dallas Roofing | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$393


Source: Levelset Data

05/11/2023

Mechanics Lien Filed

Lien filed by Goodman Distribution

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation, Longhorn Mechanical Inc

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$13,810


Source: Levelset Data

04/14/2023

Mechanics Lien Filed

Lien filed by S & K Plumbing of Fort Worth Inc. | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$180,590


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Gore Creek Partners, Wellington Development Company

Over $10,000


Source: Levelset Data

04/14/2023

Mechanics Lien Filed

Lien filed by E Connecticut Enterprises L L C | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$192,253


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

04/14/2023

Mechanics Lien Filed

Lien filed by MC Aquatic Construction LLC | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$23,300


Source: Levelset Data

04/13/2023

Mechanics Lien Filed

Lien filed by Ferguson Enterprises, Inc.

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation, Wellington Development Company

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$75,551


Source: Levelset Data

03/27/2023

Lien Threatened

Lien threat sent to 2500 San Gabriel LLC, Arch-Con Corporation, Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

03/24/2023

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $10,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

03/06/2023

Mechanics Lien Filed

Lien filed by H & H Concrete Demand of Austin

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation, Central Contractors

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$9,866


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

02/13/2023

Mechanics Lien Filed

Lien filed by Solar Innovations

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$15,560


Source: Levelset Data

02/09/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

02/09/2023

Lien Threatened

Lien threat sent to 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

02/09/2023

Lien Threatened

Lien threat sent to 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

01/30/2023

Lien Threatened

Lien threat sent to 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

01/17/2023

Lien Threatened

Lien threat sent to Sunshine Glass

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Sunshine Glass

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

01/13/2023

Slow Payment Reported


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, RL Siteworx (formerly RL Utilities)

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Gore Creek Partners, Wellington Development Company

Over $1,000


Source: Levelset Data

01/13/2023

Mechanics Lien Filed

Lien filed by S & K Plumbing of Fort Worth Inc. | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$111,815


Source: Levelset Data

12/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $1,000


Source: Levelset Data

12/15/2022

Mechanics Lien Filed

Lien filed by S & K Plumbing of Fort Worth Inc. | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$42,053


Source: Levelset Data

12/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

12/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

11/22/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $10,000


Source: Levelset Data

11/22/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $1,000


Source: Levelset Data

11/22/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $10,000


Source: Levelset Data

11/22/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $1,000


Source: Levelset Data

11/22/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation

Over $10,000


Source: Levelset Data

11/17/2022

Lien Threatened

Lien threat sent to Arch-Con Corporation, Wellington Development Company

Over $1,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $1,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc, Wellington Development Company

Over $60,000


Source: Levelset Data

11/02/2022

Mechanics Lien Filed

Lien filed by Central Contractors | Claimant directly hired by GC

Lien filed against Arch-Con Corporation, Wgc Partners

GC listed on lien: Arch-Con Corporation

$185,257


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $10,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Wellington Development Company

Over $1,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Gore Creek Partners

Over $60,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Gore Creek Partners

Over $60,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $1,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Gore Creek Partners

Over $60,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Central Contractors

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $60,000


Source: Levelset Data

05/10/2022

Mechanics Lien Filed


Source: Levelset Data

04/18/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $10,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation

Over $60,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

03/22/2022

Mechanics Lien Filed

Lien filed by Redline Concrete | Claimant directly hired by GC

Lien filed against 2500 San Gabriel LLC, Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$1,155,257


Source: Levelset Data

03/16/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

02/16/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $60,000


Source: Levelset Data

01/18/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Longhorn Mechanical Inc

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Less than $1,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $1,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

10/15/2021

Mechanics Lien Filed

Lien filed by Reinforcing Steel Supply

Lien filed against Arch-Con Corporation

GC listed on lien: Arch-Con Corporation

Property Owner: 2500 San Gabriel LLC

$9,889


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Arch-Con Corporation, Redline Concrete, Wellington Development Company

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Gore Creek Partners

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $5,000


Source: Levelset Data

09/16/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: Arch-Con Corporation

# 2021-134773 BP

$21,000,000


Source: ConstructionMonitor

09/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Gore Creek Partners

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against 2500 San Gabriel LLC, Redline Concrete, Wellington Development Company

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Arch-Con Corporation, Redline Concrete

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Redline Concrete

Over $10,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against Redline Concrete

Over $5,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against Redline Concrete

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Redline Concrete

Over $1,000


Source: Levelset Data

Full Project Job Tree30

Companies


In this section, you can find all 30 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.

Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (4)

Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)

Subcontractor (16)

Subcontractor
Concrete Contractors
Fire Suppression Companies

Supplier (9)

Surety Companies (1)

FI
Federal Insurance Company (a Chubb Company)

Job Hierarchy


Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (4)

View All
Bonded by Federal Insurance Company (a Chubb Company)

Subcontractor (16)

View All
Subcontractor

Supplier (9)

View All

Need cash to buy materials for this job?

Levelset will pay for your materials.

You pay us back up to 120 days later.

Apply Now