WashingtonBond Claims

Contractor was doing unsatisfactory work and it was one delay after another. I found while checking L and I that the contractors license had been suspended for no liability insurance. The contractor continued to work on our home even after his license had been suspended. Once we found out he had no license We have asked the contractor to not come back. Now we are worried of what the consequences will be of asking him not to come back. We have had a different contractor out to look at some of the problems that the other contractor has left us with Contractor licence had been suspended per Washington state labor and industry. Suspend date 09/13/2020 *Down payment made on 6/23/20 with agreement to start three weeks from 6/23 Job was not started till week of 8/3/20. Three weeks later than expected. *Delay in ordering materials needed for the job. The biggest problem with materials not being ordered was four weeks we lived with plastic covering gaping holes in our living room. Which requires constant maintenance by us to keep the elements out of the interior of our home. The delay in ordering products also put us even further behind in the completion of the overall job. Leaving us without lighting in the front room and kitchen. * We also have been without a kitchen sink or any kitchen appliances for an extended amount of time. * Peeling texture and paint. Will require additional work and time further delaying the completion. *Exposed wiring hanging out of the ceiling and walls *Uncovered outlets and switches. *Multiple uncovered holes in kitchen and living where recessed lighting was to be installed *Exposed finish nails on door framing. *wall over spray on all kitchen cabinets and dishwasher *floor leveling that is not level. kitchen floor with leveling applied will need to be removed This is just what we have found as of today.

0 replies