Hi, I am busy studying engineering law and standard was given the assignment for a turn key project for a new mechanical workshop that is nearing its hand over stage and the installation contractor has informed the engineer that the workshop's electrically powered(pendant controlled) overhead crane installation has been completed. The above overhead travelling crane is fitted with a single hoist that has a designed lifting capacity of 5 metric Tons and its lift is 6m. The crane's traversing bogey has a designed cross travel distance of 7,5m and long travel distance of 25m. Now the engineer instructed me to draw up a punch list of outstanding items for the hand over and acceptance of the above overhead crane installation from the contractor to the company. Assuming that the crane's concrete foundation plinths have already been inspected and accepted, i should now describe the structural and other installed components that i will inspect as well as the test and other records i will call for in order to carry out the engineer's instruction. Please may you please help me with that one

1 reply

Nov 1, 2021
i htink your question is what is a punch list and how is one prepared. Typcially, the engineer goes to the site with the approved drawings. he inspects visually, he may take measurements. any defect, deficiency or deviation is note. use a basic layout drawing to number and identify location. take photos, label by defect and location.
0 people found this helpful
Helpful