I hired contractor to remodel kitchen. During remodel he overlooked that the drain for the sink needed to be lowered. Now that cabinets, countertop and sink are installed their is not enough room to hook up drain. He doesn’t want to do what is necessary to fix problem. So now I have a kitchen with no running water or functioning sink. Can I terminate our contract and use final payment to hire someone else to fix/finish job? I am not worried about lien because he did not provide me a disclosure notice.