A map for the project located in Dallas, Texas.
Residential Construction Project at

3219 Knox St

Dallas, TX 75205

  • Last known event: 05/15/2023
  • First known event: 10/15/2019

Property Details


PROJECT TYPE

Residential

CITY

Dallas

Key Facts

The project located at 3219 Knox St, Dallas, Texas 75205 has had 43 companies do work over the last 6 years.

Lien History

There has been 2 liens at this address with a reported total value of $67,895.74.

Project History


On this project at 3219 Knox St, Dallas, TX 75205 there have been 1 permit filed, 3 preliminary notices exchanged, 0 lien waivers exchanged between companies and 2 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.

Overview

1

PERMITS FILED

3

PRELIMINARY NOTICES

0

LIEN WAIVERS

2

LIEN HISTORY

Payment Timeline

05/15/2023

Slow Payment Reported

Slow Payment Reported Against CEC Electrical LLC (TN), Cedar Maple Plaza Iii Weirs Plaza Owner, EPC-CW11 LLC

Over $10,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against CEC Facilities Group, EPC-CW11 LLC

Less than $1,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against CEC Electrical LLC (TN), EPC-CW11 LLC

Over $10,000


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against CEC Facilities Group, EPC-CW11 LLC

Less than $1,000


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against Clune Construction Company, Comet Signs

Over $5,000


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against CEC Electrical LLC (TN), EPC-CW11 LLC

Over $10,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against CEC Electrical LLC (TN), EPC-CW11 LLC

Over $10,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against CEC Electrical LLC (TN), EPC-CW11 LLC

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, K2 Construction (TX)

Over $10,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, Four Rivers Capital, J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group, Lincoln Property Company (LPC)

Less than $1,000


Source: Levelset Data

03/09/2022

Mechanics Lien Filed

Lien filed by Ferguson Enterprises, Inc.

Lien filed against City Wide Mechanical (TX), J. E. Dunn Construction Group, Weir's Plaza Owner, LLC

GC listed on lien: J. E. Dunn Construction Group

Property Owner: Weir's Plaza Owner, LLC

$57,598


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Precision Demolition (TX)

Over $1,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against CIP Paving, Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $1,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against CIP Paving, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

10/28/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: K2 Construction (TX), Weir's Furniture

# 2110281145

$41,000


Source: ConstructionMonitor

10/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $5,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against CIP Paving, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

10/14/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Less than $1,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Rumsey Construction, LLC (TX)

Over $5,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), Lincoln Property Company (LPC)

Less than $1,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, City Wide Mechanical (TX), Hartford Casualty Insurance Company, J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX)

Less than $1,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against City Wide Mechanical (TX), J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Rumsey Construction, LLC (TX)

Over $1,000


Source: Levelset Data

11/13/2020

Mechanics Lien Filed

Lien filed by Concrete Preservation | Claimant directly hired by GC

Lien filed against Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

GC listed on lien: J. E. Dunn Construction Group

$10,298


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Weir's Plaza Partnership 2311 Cedar Springs Rd Ste 300 Dallas Tx 75201

Over $60,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against Cedar Maple Plaza Iii Weirs Plaza Owner, J. E. Dunn Construction Group

Over $10,000


Source: Levelset Data

10/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Weir Family Investments Lp

Over $60,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

08/14/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

07/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Weir Family Investments Lp

Over $60,000


Source: Levelset Data

06/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Weir Family Investments Lp

Over $60,000


Source: Levelset Data

06/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

05/15/2020

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group

Over $60,000


Source: Levelset Data

05/15/2020

Slow Payment Reported

Slow Payment Reported Against Weir Family Investments Lp

Over $60,000


Source: Levelset Data

11/15/2019

Slow Payment Reported

Slow Payment Reported Against J. E. Dunn Construction Group, Weir's Plaza Partnership 2311 Cedar Springs Rd Ste 300 Dallas Tx 75201

Over $10,000


Source: Levelset Data

10/15/2019

Slow Payment Reported

Slow Payment Reported Against Southwest Construction Services, Inc. (TX)

Over $10,000


Source: Levelset Data

Full Project Job Tree43

Companies


In this section, you can find all 43 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.

Lender

Unknown Company

Property Owner

General Contractor (6)

Subcontractor (28)

Supplier (8)

BI
Barnsco, Inc. (TX)
ET
Emser Tile
FE
Ferguson Enterprises, Inc.
AR
Ahern Rentals, Inc.
LS
L&W Supply

Surety Companies

Unknown Company

Job Hierarchy


Lender

Unknown Company

Property Owner

General Contractor (6)

View All

Subcontractor (28)