1. If I have a contract with a GC to install solar panels on several properties, do I have to send NTO's to each property despite the single contract? 2. Is design and engineering part of the "45 days after first providing labor or materials?" Does our time start ticking when we first set foot on the jobsite or when we start the pre-work?