We are a general contractor also responsible for design/engineering. When determining the date labor/materials first delivered (as it pertains to notices), would that date be the date the design/engineer first began their work (which would not be at the job site) or does this date only pertain to when someone actually begins works at the job site?

1 reply

Aug 3, 2020

The question says you secs GC so I am not sure what notices you are referring to.