I’m a GC and the EC was awarded the prime contract and subcontracted me to do all the excavation but did not specify a Class A contractor was required. When I issued the change order they denied it. They owe the balance. I received a demand letter to release the lien based on California Civil Code 8460. Is there anything I can do?