Can I add a percentage of delivered (and not yet installed) imported materials in the Progress Billing evaluation?

Hawaii

The Owner claims that payments shall only be based on "As-built, As-installed, Quality-accepted" workmanship. But the contract says nothing (or even implied) about that. The progress payment clause says the Owner shall pay to the Contractor for every $30Million accomplishment. In this statement, I presumed that "accomplishment" means, as-built, as-installed, quality-accepted works + percentage of materials delivered but not yet installed (in consideration of helping the contractor ease his burden in paying the fabricator abroad for materials that are yet to be fabricated and shipped). The materials are Pre-Engineered Steel fabricated abroad and requires cash-to-cash payments (downpayment and progress billings even before shipment).

0 replies