Can Contractor claim Work description missing of "Schedule of Values" as Change order at Stipulated Sum contract ?

CaliforniaChange Orders

"Schedule of Values" was attached to A101 form as "a Exhibit". The Schedule of Values is composed of 3 columns like Division#s-Work descriptions-Prices. For example, Division 1. General Conditions / 1. Job site clean up / $12,000.00 etc. The Schedule of Values shows total 18 Divisions, 55 Work Descriptions, 59 Prices and 6 Exclusions. Actually the work descriptions don't include all indications drawn and written on drawing documents. Contractor says I don't have to install any items not including in the schedule even though the drawing specified materials like LARR #. For example, Porcelain-Paver on roof deck, Trash Chute etc. I guess the Schedule of Values shall be used as a payment method only instead of work scope or change order if General did not indicate the items in Exclusion.

0 replies